          The latest PL4809D, nonetheless, can travel faster on flat
        
        
          ground as a result of its significantly improved tractive effort.
        
        
          When lowering-in, Volvo’s single, straight travel pedal feature
        
        
          leaves the operator’s hands free to control the boom and winch.
        
        
          Volvo’s operator-friendly design even allows the operator to
        
        
          choose the preferred joystick to operate the winch, by simply
        
        
          selecting left or right via a pattern change control valve.
        
        
          When terrain conditions or obstacles call for the pipeline
        
        
          to move from one side of the ROW to the other, the only
        
        
          adjustment for a Volvo pipelayer is to simply swing the upper
        
        
          structure to position the boom on the other side. The same
        
        
          applies should any pipes need repositioning as this 360˚ swing
        
        
          capability enables it to position pipe anywhere around the
        
        
          machine.
        
        
          When the going gets tough
        
        
          Canadian contractor Surerus operates PL3005D, PL4608 and
        
        
          PL4611 pipelayers. Veteran operator Rick Gould was very pleased
        
        
          with the performance of the Volvo pipelayers. “After years of
        
        
          operating a traditional side boom machine, these took a little bit
        
        
          of getting used to. They were, simply put … different, but now I
        
        
          love them. They are versatile, you can literally offload the pipe
        
        
          and swing it 180˚ to the trench and you can’t do that with a side
        
        
          boom.”
        
        
          He went on: “operator visibility is outstanding making
        
        
          it safer for both the operator and the on-the-ground crew.
        
        
          It has superior reach and the onboard load management
        
        
          system is fantastic. And the cab ... who wouldn’t like it ...
        
        
          air conditioning, heating and a stereo. This is a first class
        
        
          machine.”
        
        
          Given the importance of machine stability, the lower centre
        
        
          of gravity of Volvo pipelayers is a major contributor, in addition
        
        
          to improving the ability to manage heavy loads. This is achieved
        
        
          due to the boom being mounted inside the track frame of what
        
        
          is already a wide and stable platform; the centre of gravity
        
        
          is further lowered with the addition of hook-on, track frame
        
        
          counterweights on the PL4608 and latest PL4809D models. The
        
        
          counterweight design facilitates cleaning in addition to the ease
        
        
          of hooking them off to reduce machine weight for transportation
        
        
          where strict weight limits may apply.
        
        
          On the PL4608/PL4809D a hydraulically variable
        
        
          undercarriage allows the track width to be increased by
        
        
          500 mm for additional site stability and simply retracted for
        
        
          transportation. Should at any point, due to ground conditions,
        
        
          the machines may need to sit back from the trench, the flick
        
        
          of a switch can raise the hydraulically elevating cab to provide
        
        
          excellent visibility into the trench as well as over the work site
        
        
          and, especially, to any personnel on the ground. The latest Volvo
        
        
          p l a n t a n d m a c h i n e t e c h n i q u e s
        
        
        
          
             ifting.com
          
        
        
          Schoenbeck GmbH & Co. KG
        
        
          •
        
        
          Germany
        
        
        
          • 
        
        
        
          Tel. +49 5721 99 44 39-26 • Fax +49 5721 99 44 39-23
        
        
          Work with the best!
        
        
          Lift your expectations
        
        
          
            ®
          
        
        
          Coming Next Month
        
        
          • Coatings Q&A
        
        
          • River crossings
        
        
          • EPC project stories
        
        
          • Subsea maintenance and equipment