Oilfield Technology - January 2016 - page 9

© 2016 Halliburton. All Rights Reserved.
Reduce RigTime
and Risk
with the evo-ReD
®
BRiDge Plug
On a typical subsea operation, an Evo-RED
®
bridge plug can reduce wireline runs from
eight to one, which can save over 24 hours
of rig time. It can be remotely opened and
closed without the need for intervention or any
control lines to surface, increasing reliability
and reducing uncertainty. It also can simplify
both intervention and completion applications
by removing wireline runs.
Every step of the way, we get results together.
halliburton.com/evo-red
1,2,3,4,5,6,7,8 10,11,12,13,14,15,16,17,18,19,...76
Powered by FlippingBook